  1. 01

    Sanding the flat surfaces

    Abrasive: P150, P180, P220

    Work through P150 → P180 → P220 along the grain. Don't go finer than P220 on oak: the pores clog with dust and take the glaze less well.

  2. 02

    Sanding the profiles

    Abrasive: K60, K80

    Profiles and routed edges are done with flexible abrasive mats K60 and K80 (designation as given in the official schedule; these are mat grades, not FEPA P60/P80 paper).

  3. 03

    Applying the glaze (wiping stain)

    CGS 100 %

    Officially sprayed and then rubbed in, 80–100 g/m² (CGS21 page). Long open time, so large panels are workable. Stir thoroughly — the pigment settles.

  4. 04

    Wiping off excess stain

    Brush the excess out along the grain: the glaze stays in the pores and brings out the oak figure while the surface evens out in tone.

  5. 05

    Drying

    Drying: 20 °C, 10 min

    10 min at 20 °C before priming (official schedule).

  6. 06

    Priming

    ATS20 100 %AC40 20 % (Hardener)S50 30 % (Thinner)

    Consumption
    150official

    Two-pack clear acrylic sealer; non-yellowing and keeps the pores crisp on open-pore work. One coat at ~150 g/m² without flooding the pores. Pot life of the mix is 6 h at 20 °C.

    Mix for this step

    Mix calculator

    g
    Hardener20.0 %

    AC40: 20.0 % — fixed by the datasheet

    Thinner30.0 %

    S50: 30.0 % — fixed by the datasheet

    Ratio 100 : 20.0 : 30.0

    ComponentWeigh out
    ATS20part A333 g
    AC40Hardener66.7 g
    S50Thinner100 g
    Total500 g

    Covers roughly 3.33 m² at 150 g/m².

    Pot life of the mix: 6 h.

  7. 07

    Drying

    Drying: 30–35 °C, 1.5 h

    Forced drying, 1.5 h at 30–35 °C. At 20 °C the dealer gives 4 h before sanding (ATS20).

  8. 08

    Sanding the primer

    Abrasive: P240, P280, P320

    Light de-nib with P240 → P280 → P320, just enough to knock down raised fibres; don't cut through the primer into the glaze.

  9. 09

    Sanding the profiles

    Abrasive: K60, K80

    Profiles with K60/K80 mats; go easy on edges where the primer is thinnest.

  10. 10

    Applying the patina

    CQS 100 %S10 100 % (Thinner)

    The patina goes over the sanded acrylic primer and settles into the pores and profile corners.

    Mix for this step

    Mix calculator

    g
    Thinner100.0 %

    S10: 100.0 % — fixed by the datasheet

    Ratio 100 : 100.0

    ComponentWeigh out
    CQSpart A250 g
    S10Thinner250 g
    Total500 g

    Covers roughly 6.25 m² at 80 g/m².

  11. 11

    Drying

    Drying: 20–25 °C, 5 min

    5 min at 20–25 °C (dealer gives 5–10 min before wiping back for CQS10).

  12. 12

    Wiping back the patina

    Abrasive: Scotch-Brite 07448 S UFN

    Rub the patina off the flats by hand with the pad so it stays only in the pores and profiles. "07448 S UFN" is the 3M Scotch-Brite non-woven pad reference, not a Technocolor product.

  13. 13

    Applying the lacquer

    ATL20 100 %AC40 20 % (Hardener)S80 30 % (Thinner)CTS 0.5 % (Additive)

    Consumption
    150official

    Clear 2K acrylic topcoat, one coat at ~150 g/m². The pores stay open — don't build a heavy coat. Pot life 6 h at 20 °C.

    Mix for this step

    Mix calculator

    g
    Hardener20.0 %

    AC40: 20.0 % — fixed by the datasheet

    Thinner30.0 %

    S80: 30.0 % — fixed by the datasheet

    Additive0.5 %

    CTS: 0.5 % — fixed by the datasheet

    Ratio 100 : 20.0 : 30.0 : 0.5

    ComponentWeigh out
    ATL20part A332 g
    AC40Hardener66.4 g
    S80Thinner99.7 g
    CTSAdditive1.7 g
    Total500 g

    Covers roughly 3.33 m² at 150 g/m².

    Pot life of the mix: 6 h.

  14. 14

    Drying

    Drying: 30–35 °C, 1.5 h

    1.5 h at 30–35 °C (numbered "11" by mistake in the official schedule). At 20 °C: touch-dry ~20 min, fully dry 8 h (dealer); full chemical resistance takes several days.

Ask about this system

Answers are based on this finishing schedule and its products.

Questions and answers are stored to improve the assistant and prevent abuse; the question text is processed by Anthropic (USA). Privacy policy

System characteristics

Vocabulary source
https://www.t-color.ru/information/characteristics/
Mix solids · Primer
25.1 %recommended
Dry film thickness (µm) · Primer
≈35 applied, ≈25–30 after sandingrecommended
Dry film thickness (µm) · Lacquer
≈30–33recommended
Dry film thickness (µm) · Total
≈55–65recommended
Hardness
High abrasion resistance, washable; no numeric hardness (pencil ASTM D3363 / pendulum ISO 1522) is published.dealer
Elasticity
Good — acrylic lacquers on AC40 are elastic.catalog
Chemical resistance
High physical/chemical resistance; suitable for kitchens and bathrooms.official
Lightfastness
Non-yellowing: aliphatic AC40 hardener + acrylic binder.catalog
Adhesion
Good provided the P240–P320 inter-coat sanding is done; glaze and patina are thin and don't break adhesion.recommended
Pot life
6dealer
Interior or exterior
interiordealer
Texture
Open pore: oak pores left unfilled, highlighted by glaze and patina.official
Coats
4
Coats detail
glaze, primer, patina, lacquer (2 of them film-forming)
Min cycle time (h)
3.25
Min cycle time: why
Sum of the schedule's drying steps: 10 min + 1.5 h + 5 min + 1.5 h = 3 h 15 min with forced drying at 30–35 °C; excludes sanding/wiping labour. At 20 °C expect ~1 working day (ATS20 4 h to sand, ATL20 8 h full dry).
Technocolor finishing schedule ↗