Skip to content
← All systems

UV-cure acrylate (VTS40041 100 %-solids UV primer + VTL30040 solvent-borne UV lacquer) over a solvent-borne dye stain (CTU + CFS1 binder + S12)

Mouldings and picture-frame stock — UV finish

Substrate
Solid-wood mouldings and picture-frame stock (profiles, frame mouldings, trims), prepared with K60–K80 abrasive brushes.
Result
Transparent stained finish that keeps the wood grain visible, 40-gloss semi-matt clear; inline process with UV curing — parts can be packed as soon as they cool.
  1. 01

    Sanding

    Abrasive: K60, K80

    Abrasive brushes (abrasive-filament), not belts, so the tool follows the profile. K60 removes fuzz and cutter marks, K80 refines the scratch before staining.

  2. 02

    Stain application

    CTU 100 %CFS1 150 %S12 500 % (Thinner)

    Nozzle
    1–1.3recommended
    Pressure
    1.5–2recommended
    Consumption
    80

    80 g/m² is the low end of the official CTU rate (80–100 g/m²). Don't flood — dye pools and darkens in the profile recesses. On a vacuum line the stain can also go through a vacuum chamber (common practice, not in the schedule).

    Mix for this step

    Mix calculator

    g
    base150.0 %

    CFS1: 150.0 % — fixed by the datasheet

    Thinner500.0 %

    S12: 500.0 % — fixed by the datasheet

    Ratio 100 : 150.0 : 500.0

    ComponentWeigh out
    CTUpart A66.7 g
    CFS1base100 g
    S12Thinner333 g
    Total500 g

    Covers roughly 6.25 m² at 80 g/m².

    Pot life of the mix: n/a — 1K, no hardener.

  3. 03

    Drying

    Drying: [object Object] °C, 5 min

    All S12 must be gone before priming: VTS40041 has no flash-off, so trapped solvent under it causes bubbles and poor adhesion. The dealer's 2 h full dry for CTU is for stand-alone dye; inline the schedule's 5 min applies.

  4. 04

    Priming

    VTS40041 100 %

    Consumption
    100

    100 g/m² is the top of the official range (80–100 g/m²). 100 % solids, no flash-off needed before UV. Keep the tank temperature stable — viscosity governs the film weight.

  5. 05

    UV lamp cure

    Drying: UV pass at 30 m/min (seconds under the lamps)

    Intermediate ('sanding') cure at a fast belt speed, 30 m/min. Lamp count/power not given for this step; by analogy with step 9, 80–120 W/cm lamps.

  6. 06

    Sanding

    Abrasive: K120, K150

    Brush-sand the cured primer to knock down raised grain and key it for intercoat adhesion. Don't cut through to the stain on profile edges.

  7. 07

    Lacquer application

    VTL30040 100 %S11 20 % (Thinner)

    Nozzle
    1.5–1.8 (typ. 1.6)recommended
    Pressure
    2.5–3.5recommended
    Consumption
    150

    The schedule's 150 g/m² is above the official lacquer rate (110–130 g/m²) because it includes 20 % thinner (≈125 g/m² of lacquer itself). Watch for sags on vertical profile faces — the lacquer isn't thixotropic.

    Mix for this step

    Mix calculator

    g
    Thinner20.0 %

    S11: 20.0 % — fixed by the datasheet

    Ratio 100 : 20.0

    ComponentWeigh out
    VTL30040part A417 g
    S11Thinner83.3 g
    Total500 g

    Covers roughly 3.33 m² at 150 g/m².

    Pot life of the mix: not applicable (1K); keep the cup and lines shielded from daylight/UV.

  8. 08

    Flash-off

    Drying: [object Object] °C, 5–10 min

    Mandatory flash-off: the solvent (≈55 % of the lacquer plus the S11) must leave before the lamps, otherwise haze, bubbles and under-cure.

  9. 09

    Final UV cure

    Drying: 3 lamps 80–120 W, belt 10 m/min

    Final cure: 3 lamps at 80–120 W (normally W per cm of lamp length), 10 m/min. Parts can be packed once cool.

Ask about this system

Answers are based on this finishing schedule and its products.

Questions and answers are stored to improve the assistant and prevent abuse; the question text is processed by Anthropic (USA). Privacy policy

System characteristics

Vocabulary
Terms follow the official 'Основные характеристики ЛКМ' page: вязкость, тиксотропность, степень блеска, жизнестойкость, время сушки, адгезия, сухой остаток, твёрдость, эластичность, износостойкость, химическая стойкость, светостойкость, укрывистость.official
Solids
Primer VTS40041 100 %; lacquer VTL30040 44–46 % (part A), ≈37–38 % in the 20 %-thinned mix; stain mix — not published.official
Total build
≈115–145 µm dry before the primer is sanded (primer ≈85–95 µm + lacquer ≈48–55 µm + stain <5 µm); ≈105–135 µm after K120/K150 brushing.recommended
Gloss level
40 gloss units at 60°official
Hardness
High: UV acrylate film, lacquer described as 'scratch- and scuff-resistant', hardness is reached immediately after UV. No numbers (pencil ASTM D3363, pendulum ISO 1522) published.catalog
Wear resistance
Good: VTS40041 is described as having 'strength and wear resistance', the lacquer as scuff-resistant. No Taber data published.catalog
Chemical resistance
High physical-chemical resistance (water, alcohol, coffee — the usual furniture tests); the catalog recommends the VTL300XX series even for bathroom furniture. No test protocols published.official
Lightfastness
Moderate, limited by the dye: transparent CTU dyes are brighter but less lightfast than pigment stains (catalog). The UV acrylate clear yellows little. For frames on a sunny wall, test a panel or switch to a pigment stain.recommended
Adhesion
Relies on keying the primer with K120/K150 brushes before the lacquer and on full S12 flash-off from the stain before the UV primer. No cross-cut (DIN 53151) data published.recommended
Elasticity
Limited: UV films are hard and relatively brittle; at ~120–140 µm on a profile, cracking on sharp arrises or with wood movement is possible — don't exceed the schedule rates.recommended
Pot life
Not limited: every material is 1K (no hardener); keep UV materials closed and shielded from daylight.recommended
Viscosity
Not published. Guide: stain mix ≈10–12 s, lacquer with S11 ≈18–22 s (DIN4, 20 °C); VTS40041 is used as supplied, viscosity follows tank temperature.recommended
Thixotropy
norecommended
Hiding power
n/aofficial
Drying time
Dust-free / touch-dry / stackable — straight out of the UV tunnel once cool; full cure of the UV film within ~24 h (post-cure).recommended
Coats
3
Coats detail
stain + primer + topcoat
Min cycle time (h)
0.25
Min cycle time: why
Derived: 5 min stain flash + 5 min lacquer flash (minimum) + UV passes (seconds at 30 and 10 m/min) + two brushing passes + cooling/handling ≈ 15 min end-to-end on an inline machine.